|
Product Detail :
|
UNDER FRAME (LWLRRM) . * UNDER FRAME COMPLETE FOR POWER CAR-LHB EOG COACHES TO DRG. NO. LP11103,
ALT "d", ANX-9 (WITHOUT ITEM 30 TO DRG. NO.1.11012.0.03.095.001) For Painting Drg No (538) LWL
RRM-1-1-116, Alt "e" to be followed THE MANUFACTURING FACILITY AS PER ICF/MD/SPEC-147, ISSUE S
TATUS-01,REV.02 WITH AMENDMENT No.02. Special Condition -THE UNDER FRAME SHOULD BE SUPP
LIED AS NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. PACKING CONDITION AS PER DRG NO. ICF/J
&T/MISC-2487, Alt b. STAGE INSPECTION DETAIL. (a) Raw Material Stage Ensure the raw material u
sed using portable spectrometer (b) Jig stage Assembly of front part with sole bar. Assembly of m
odular frame arrangement. Weld parameters to be checked & recorded (c) Trestle stage Marking,
Drilling & Tapping of holes wherever necessary. Marking & placing of detail items. Complete weldi
ng wherever necessary. Weld parameters to be checked & recorded Assembly & Welding of troug
h sheets. Dimensional & Visual checks. Punching of Serial No & ensuring proper traceability. (d) S
urface preparation and painting stage. Short/Sand blast to the requirements. Painting process as
per the specification. Visual inspection. Final product Inspection. Note Application of Aluminium w
elding coat to RCF spec MDTS-28272 latest revision on top surface of cross members shall be ensured
before welding the trough floor with cross members to avoid bi-metallic corrossion. [ Warranty Perio
d 30 Months after the date of delivery ]
[Quantity Tolerance (+/-) 5 %age , Item Category Normal , Total PO value variation Permitt
ed Max 8 lacs ] ]
|