Product Detail :
|
I. laying of appx. 256.41 km of subsea pipelines in 37 segment and topside modifications, ii. in addition to above a. riser replacement at 2 pipeline segments. b. topside modifications- 52 nos. c. topside demolitions-33 nos. d. riser installations -57 nos. e. riser demolitions-53 nos. f. cable laying -0.1 km hi to hp g. total 37.70 km of 2 pipeline piggy backed (6 segments).
|